Tuesday 30 July 2013

Summer Cruise 2013 (8)

leeds Clarence Dock (Rest Day)

More rain fell overnight but the sky was clear by dawn. The wind was quite cool. A few boats have left heading for the Leeds Liverpool Canal.

Morning: The usual chores, shopping and dog walking. The bollard on the visitor mooring had a power credit of £11.63! Met up and had a brief chat with DeanS off the Canal World Forum.

Afternoon: Visit to the Royal Armouries then a few tasks around the boat. Filling the water tank.

Evening: Friends round for a few beers. Just a relaxing day with the Kindle and iPod for entertainment.

Wildlife: Pigeon.

Todays Total.
Miles: 0.0
Locks: 0
Swing / Lift Bridges: 0
Tunnels. 0
Pump Outs: 0
Engine Hours: 0.0
Solar Panels: 0 Ah

Accumulated Total.
Miles: 1496.8
Locks: 992
Swing / Lift Bridges: 196
Tunnels. 24
Pump Outs: 14
Engine Hours: 2605.1
Solar Panels: 9590 Ah

No comments:

Post a Comment

Please put your name to your comment. Comments without a name may automatically be treated as spam and might not be included.

If you do not wish your comment to be published say so in your comment. If you have a tip or sensitive information you’d prefer to share anonymously, you may do so. I will delete the comment after reading.